Plumbers NZ is New Zealand's largest online plumbing, gas and drainage resource. Plumbing exam help, plumbing news, directory and free quotes.
-
This is an install of a pressure relief valve from a HWC in the roof space of a business. The mains has a solenoid which gets switched off during closing hours for flood prevention but when it's opened (especially after long holidays), the valve gushes into a small trap (which has A/C drains also) and overflows into the roof space. Firstly is this to code and secondly what is the solution? Cheers