Title: Question 6
Post by: LisaS on April 20, 2009, 02:16:51 PM
QUESTION 6
The plan below shows a house site.
The foul water drainage system is to be a typical single stage septic tank.
The foul water is to include a septic tank, distribution box, and two effluent lines from the
distribution box each approximately 40m in length.
Draw and label all pipe work, bends, junctions, gullies, ventilation, access, septic tank, distribution
box and effluent lines to meet the minimum requirements in compliance with AS/NZS 3500: Part 2
Sanitary plumbing and drainage.

PLEASE SEE PDF FOR IMAGES

Total 10 marks