Plumbers NZ | Plumbing, Gasfitting and Drainage Community

Support => exam support and downloads => Plumbing, Gas fitting and Drainlaying Apprentice Support => Drainlaying Exam June 2007 => Topic started by: LisaS on March 30, 2009, 08:53:42 PM

Plumbers NZ is New Zealand's largest online plumbing, gas and drainage resource. Plumbing exam help, plumbing news, directory and free quotes.

Title: Question 9
Post by: LisaS on March 30, 2009, 08:53:42 PM
On the plan provided, draw the house drainage system (foul water) for a typical single stage 
septic tank.
The system is to include a septic tank, a distribution box, two separate absorption trenches
(effluent disposal), pipe work, bends, junctions, fittings, inspections and ventilation.
Each absorption trench is to be approximately 20 metres long.

PLEASE SEE PDF FOR IMAGE

Total 10 marks